;
Email: sales@grandcable.cn  Tel: +86-510-80711619  Phone:+86-15995373573
EnglishEnglish
HOME banner 4 V3 Google AMP logo
"Lighting Your World Up!"
View More >>
HOME banner 1 V2 Google AMP logo
FOCUS ON
CABLE AND CONDUCTOR
MANUFACTURING
View More >>
HOME banner 2 V2 Google AMP logo
FOCUS ON
INTERNATIONAL
POWER PROJECTS
View More >>
HOME banner 3 V2 View More >>
FOCUS ON
PEAK CARBON DIOXIDE EMISSION
AND CARBON NEUTRALITY
Google AMP logo

Tanzania Substation Project - Earthing Cables and Conductors Supply

Views: 9     Author: Site Editor     Publish Time: 2024-06-20      Origin: Site

Tanesco-TERUI


Project Information:


Owner: Tanzania Electric Supply Company Limited(TANESCO)

Awarded Date: 2024.06


What We Supplied:


H07V-R 1x50mm2 (Green)

H07V-R 1x95mm2 (Green)

Annealed Bare Copper Conductor 50mm2

Annealed Bare Copper Conductor 125mm2


Project News:


TANESCO owns interconnection power grid made up of generation system transmission and distribution system. Transmission system comprises of fifty-seven (57) Substations interconnected by transmission lines. Transmission lines network comprises of 3010.7 km of 220 kV, 1672.57 km of 132 kV, 543 km of 66kV and 670 km 400kV totalling 5896.27 km by the end of December 2019.


TANESCO future transmission network will include ongoing projects of 414 km of 400 kV Singida – Arusha - Namanga transmission line , 293km of 220kV Transmission line from Bulyanhulu-Geita-Nyakanazi-Rusumo, 161km of 220kV SGR 1 Transmission line from Dar es Salaam to Morogoro, 381km of 132kV Tabora – Ipole – Inyonga- Katavi transmission line, 395km of 132kV Tabora – Urambo – Nguruka (Mganza) – Kigoma (Kidahwe) Transmission line and 14km of 132kV Kibada Kigamboni transmission line (this will have a pie configuration at Kibada from the Kurasini Mbagala Transmission line).


Other projects at which are at inception stages includes 400 kV double circuit TL from Julius Nyerere Hydropower plant to Dodoma and Kinyerezi via Chalinze and associated substations, Construction of 372 km, 400 kV double circuit TL from Julius Nyerere Hydropower plant to Kinyerezi via Kibiti, Somangafungu – Kibiti  and associated substation at Kibiti, 60km, 220kV from Chalinze to Bagamoyo,64km 220kV Segera – Tanga, 280km, 400kV line from Nyakanazi – Kigoma, 530km of 400kV Transmission line from Kigoma -Katavi – Sumbawanga, 620km, 400kV line from Iringa - Kisada – Mbeya – Tunduma - Sumbawanga, 4km, 330kV from Tunduma to the border with Zambia, 400kV line from Mtwara – Songea,414km of  220 kV Morogoro - Makutupora Transmission Line project for electrification of SGR2 line (414 km) and Bay extension at Msamvu and Zuzu Grid Substations and Construction of various TANESCO buildings including Regional and Districts offices.

Subsribe Now
Get Daily Update Into Your Mail For join Now

ABOUT US

With professional rich expeience in overseas business, Grand Cable is able to supply cables up to 500kV for global projects.
View More

QUICK LINKS

PRODUCTS

CONTACT US

  No.48 Cangpu Road, Yicheng Street, Yixing City, Jiangsu Province, China

  +86-510-80711619
    +86-15995373573
Copyright © 2020 Jiangsu Grand Cable Co., Ltd.  All Rights Reserved.  Supported By Leadong Sitemap